1 | USESULE-KOMANGA LOT1 | 117.67 | 12/11/2017 | 158.8 |
2 | KOMANGA KASINDE LOT2 | 112.80 | 12/11/2017 | 140 |
3 | KASINDE-MPANDA LOT3 | 108.00 | 12/11/2017 | 133.8 |
4 | KANYANI JUNCTION - MVUGWE SECTION | 70.50 | 20/02/2021 | 83.741 |
5 | KASULU - MANYOVU SECTION INCLUDING KASULU TOWN LINK | 68.25 | 20/02/2021 | 76.18 |
6 | KIDATU-IFAKARA | 66.90 | 04/11/2016 | 104.8 |
7 | NDUTA JUNCTION - KABINGO SECTION | 62.50 | 20/02/2021 | 80.963 |
8 | LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION | 60.00 | 14/02/2020 | 120.86 |
9 | MVUGWE - NDUTA JUNCTION SECTION | 59.35 | 20/02/2021 | 84.756 |
10 | NYAMUSWA - BULAMBA | 56.40 | 01/04/2020 | 46.5 |
11 | NJOMBE-MORONGA LOT1 | 53.90 | 06/02/2017 | 107.085 |
12 | MORONGA-MAKETE LOT2 | 53.50 | 06/02/2017 | 110.446 |
13 | UPGRADING OF NACHINGWEA-RUANGWA-NANGANGA ROAD (106KM) ; LOT2; RUANGWA-NANGANGA SECTION (53.2KM) | 53.20 | 27/06/2020 | 50.341 |
14 | LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION | 52.30 | 10/07/2020 | 100.84 |
15 | LOT1; PANGANI-TANGA SECTION | 50.00 | 19/07/2019 | 66.853 |
16 | MAKUTANO - NATTA | 50.00 | 05/04/2013 | 46.138 |
17 | BULAMBA - KISORYA | 50.00 | 05/11/2013 | 51.281 |
18 | NYAKANAZI - KIBONDO | 50.00 | 27/04/2014 | 45.985 |
19 | LUSITU-MAWENGI LOT2 | 50.00 | 22/08/2016 | 159.217 |
20 | WASO-SALE | 49.00 | 19/05/2017 | 87.2 |