| NAME | UPGRADING OF NACHINGWEA-RUANGWA-NANGANGA ROAD (106KM) ; LOT2; RUANGWA-NANGANGA SECTION (53.2KM) | 
| LENGTH (km) | 53.20 | 
|---|---|
| SIGNING DATE | 27/06/2020 | 
| CONTRACT SUM (Bil) | 50.341 | 
| CONTRACTOR | CR15G | 
| CONSULTANT | TECU | 
| FINANCIER | GOT | 
| STAGE | On-going | 