| 21 | BRT Phase 2 Lot 1 | 20.30 | 10/12/2018 | 189.4 |
| 22 | RUDEWA - KILOSA | 24.00 | 26/09/2019 | 32.93 |
| 23 | KIBONDO - TOWN - LINK | 25.00 | 18/12/2019 | 37.64 |
| 24 | TABORA - SIKONGE | 30.00 | 31/03/2014 | 28.645 |
| 25 | KIKUSYA - IPINDA - MATEMA | 34.60 | 27/04/2015 | 56.911 |
| 26 | MPANDA - IFUKUTWA - VIKONGE | 35.00 | 29/07/2016 | 57.871 |
| 27 | KAZILAMBWA - CHAGU | 36.00 | 27/12/2019 | 32 |
| 28 | CHUNYA-MAKONGOLOSI | 39.00 | 19/07/2017 | 59.7 |
| 29 | SANZATE - NATTA | 40.00 | 02/04/2020 | 39.469 |
| 30 | WASO-SALE | 49.00 | 19/05/2017 | 87.2 |
| 31 | LOT1; PANGANI-TANGA SECTION | 50.00 | 19/07/2019 | 66.853 |
| 32 | MAKUTANO - NATTA | 50.00 | 05/04/2013 | 46.138 |
| 33 | BULAMBA - KISORYA | 50.00 | 05/11/2013 | 51.281 |
| 34 | NYAKANAZI - KIBONDO | 50.00 | 27/04/2014 | 45.985 |
| 35 | LUSITU-MAWENGI LOT2 | 50.00 | 22/08/2016 | 159.217 |
| 36 | LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION | 52.30 | 10/07/2020 | 100.84 |
| 37 | UPGRADING OF NACHINGWEA-RUANGWA-NANGANGA ROAD (106KM) ; LOT2; RUANGWA-NANGANGA SECTION (53.2KM) | 53.20 | 27/06/2020 | 50.341 |
| 38 | MORONGA-MAKETE LOT2 | 53.50 | 06/02/2017 | 110.446 |
| 39 | NJOMBE-MORONGA LOT1 | 53.90 | 06/02/2017 | 107.085 |
| 40 | NYAMUSWA - BULAMBA | 56.40 | 01/04/2020 | 46.5 |