#NameLength (km)Signing DateContract Sum (Bil)
1J.P. MAGUFULI BRIDGE3.2029/07/2019592609
2BRT Phase 2 Lot 120.3010/12/2018189.4
3LUSITU-MAWENGI LOT250.0022/08/2016159.217
4USESULE-KOMANGA LOT1117.6712/11/2017158.8
5WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA) 19.2013/07/2018140.45
6KOMANGA KASINDE LOT2112.8012/11/2017140
7KASINDE-MPANDA LOT3108.0012/11/2017133.8
8LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION60.0014/02/2020120.86
9MORONGA-MAKETE LOT253.5006/02/2017110.446
10NJOMBE-MORONGA LOT153.9006/02/2017107.085
11KIDATU-IFAKARA66.9004/11/2016104.8
12LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION52.3010/07/2020100.84
13MWANZA AIRPORT-06/11/201287.29
14WASO-SALE49.0019/05/201787.2
15MVUGWE - NDUTA JUNCTION SECTION59.3520/02/202184.756
16KANYANI JUNCTION - MVUGWE SECTION70.5020/02/202183.741
17NDUTA JUNCTION - KABINGO SECTION62.5020/02/202180.963
18KASULU - MANYOVU SECTION INCLUDING KASULU TOWN LINK 68.2520/02/202176.18
19NEW WAMI BRIDGE4.3328/06/201867.78
20LOT1; PANGANI-TANGA SECTION50.0019/07/201966.853