| 21 | SONGEA AIRPORT | - | 17/09/2018 | 37.09 |
| 22 | WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA) | 19.20 | 13/07/2018 | 140.45 |
| 23 | NEW WAMI BRIDGE | 4.33 | 28/06/2018 | 67.78 |
| 24 | USESULE-KOMANGA LOT1 | 117.67 | 12/11/2017 | 158.8 |
| 25 | KOMANGA KASINDE LOT2 | 112.80 | 12/11/2017 | 140 |
| 26 | KASINDE-MPANDA LOT3 | 108.00 | 12/11/2017 | 133.8 |
| 27 | MTWARA AIRPORT | - | 11/09/2017 | 50.36 |
| 28 | CHUNYA-MAKONGOLOSI | 39.00 | 19/07/2017 | 59.7 |
| 29 | SHINYANGA AIRPORT | - | 30/06/2017 | 55.9 |
| 30 | SUMBAWANGA AIRPORT | - | 30/06/2017 | 57.29 |
| 31 | TABORA AIPORT PHASE III | - | 30/06/2017 | 27.3 |
| 32 | WASO-SALE | 49.00 | 19/05/2017 | 87.2 |
| 33 | WIDENING MWANZA AIRPORT ROAD | 5.33 | 18/03/2017 | 9.54 |
| 34 | BRT Phase 2 Lot 2 | - | 22/02/2017 | 44.8 |
| 35 | NJOMBE-MORONGA LOT1 | 53.90 | 06/02/2017 | 107.085 |
| 36 | MORONGA-MAKETE LOT2 | 53.50 | 06/02/2017 | 110.446 |
| 37 | ONE STOP INSPECTION STATION (OSIS) - NYAKANAZI | - | 20/12/2016 | 25.028 |
| 38 | ONE STOP INSPECTION STATION (OSIS) - MANYONI | - | 16/12/2016 | 24.91 |
| 39 | KIDATU-IFAKARA | 66.90 | 04/11/2016 | 104.8 |
| 40 | GEITA AIRPORT | - | 09/09/2016 | 39.15 |