Addenda, clarifications and minutes of pre bid meeting

#Project NameTender No
61CONSTRUCTION OF DODOMA CITY OUTER DUAL CARRIAGEWAY RING ROAD (112.3 KM) TO BITUMEN STANDARD, LOT 2: IHUMWA DRY PORT - MATUMBULU - NALA (60.0 KM)AE/001/2019-20/HQ/W/02
62CONSTRUCTION OF DODOMA CITY OUTER DUAL CARRIAGEWAY RING ROAD (112.3 KM) TO BITUMEN STANDARD, LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT (52.3 KM)AE/001/2019-20/HQ/W/01
63CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE PHASE 3 – LOT 1: ROAD WORKS (23.33 KM) INCLUDING BUS STATIONS ALONG AZIKIWE/MAKTABA, BIBI TITI/NYERERE ROAD, TAZARA/UHURU ROAD AND SHAURIMOYO/LINDI STREETSAE/001/2019-20/HQ/W/03
64CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE PHASE 2: ROAD WORKS (20.3 KM) INCLUDING TWO FLYOVERS AND 29 BUS STATIONS ALONG KILWA ROAD (FROM CBD - KARIAKOO TO MBAGALA) AE/001/2017-18/HQ/W/98
65CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE - PHASE 5 – PACKAGE A: LOT 1: ROAD WORKS (19.3 KM), 20 CONVENTIONAL BUS STATIONS AND 2 PEDESTRIAN BRIDGE AND LOT 2: ROAD WORKS (9.4KM) AND 12 CONVENTIONAL BUS STATIONSAE/001/2022-2023/HQ/W/62
66CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE - PHASE 4 - PACKAGE B: LOT 3: BUILDING WORKS - MBUYUNI DEPOT, SIMU2000 DEPOT AND KIVUKONI TERMINAL, AE/001/2021-2022/HQ/W/50
67CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTURE - PHASE 4 - PACKAGE A: LOT 1 AND LOT 2 .AE/001/2021-2022/HQ/W/48
68CONSTRUCTION OF (MANYOVU/MUGINA) ONE STOP BORDER POST {OSBP) AT TANZANIA SIDE - PHASE IAE/001/2023-24/HQlW/56
69CONSTRUCTION OF DAR ES SALAAM BUS RAPID TRANSIT (BRT) INFRASTRUCTUREAE/001/2017-18/HQIW/31
70BALANCE WORKS FOR CONSTRUCTION OF TERMINAL BUILDING AT SONGWE AIRPORT AE/001/2019-20/HQ/W/44
71 UPGRADING OF MNIVATA –NEWALA- MASASI ROAD (160 KM) TO BITUMEN STANDARD: LOT 1: MNIVATA - MITESA SECTION (100 KM) AND LOT 2: MITESA-MASASI SECTION (60KM) INCLUDING CONSTRUCTION OF MWITI BRIDGEAE/001/2021-22/HQ/W/19
72 UPGRADING OF MNIVATA – NEWALA - MASASI ROAD (160 KM) TO BITUMEN STANDARD: LOT 1: MNIVATA – MITESA SECTION (100 KM) AND LOT 2: MITESA – MASASI SECTION (60KM) INCLUDING CONSTRUCTION OF MWITI BRIDGE.AE/001/2021-22/HQ/W/19
73 REHABILITATION AND UPGRADING OF KIGOMA, TABORA SHINYANGA, AND SUMBAWANGA AIRPORTS, LOT 1: FURTHER REHABILITATION AND UPGRADING OF KIGOMA AIRPORT AE/001/2017-18/HQ/W/92