On-going
# | Name | Length (km) | Signing Date | Contract Sum (Bil) |
---|---|---|---|---|
41 | MORONGA-MAKETE LOT2 | 53.50 | 06/02/2017 | 110.446 |
42 | LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION | 60.00 | 14/02/2020 | 120.86 |
43 | KASINDE-MPANDA LOT3 | 108.00 | 12/11/2017 | 133.8 |
44 | KOMANGA KASINDE LOT2 | 112.80 | 12/11/2017 | 140 |
45 | WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA) | 19.20 | 13/07/2018 | 140.45 |
46 | USESULE-KOMANGA LOT1 | 117.67 | 12/11/2017 | 158.8 |
47 | LUSITU-MAWENGI LOT2 | 50.00 | 22/08/2016 | 159.217 |
48 | BRT Phase 2 Lot 1 | 20.30 | 10/12/2018 | 189.4 |
49 | J.P. MAGUFULI BRIDGE | 3.20 | 29/07/2019 | 592609 |