Projects

On-going

#NameLength (km)Signing DateContract Sum (Bil)
41MORONGA-MAKETE LOT253.5006/02/2017110.446
42LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION60.0014/02/2020120.86
43KASINDE-MPANDA LOT3108.0012/11/2017133.8
44KOMANGA KASINDE LOT2112.8012/11/2017140
45WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA) 19.2013/07/2018140.45
46USESULE-KOMANGA LOT1117.6712/11/2017158.8
47LUSITU-MAWENGI LOT250.0022/08/2016159.217
48BRT Phase 2 Lot 120.3010/12/2018189.4
49J.P. MAGUFULI BRIDGE3.2029/07/2019592609