On-going
# | Name | Length (km) | Signing Date | Contract Sum (Bil) |
---|---|---|---|---|
41 | MVUGWE - NDUTA JUNCTION SECTION | 59.35 | 20/02/2021 | 84.756 |
42 | LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION | 60.00 | 14/02/2020 | 120.86 |
43 | NDUTA JUNCTION - KABINGO SECTION | 62.50 | 20/02/2021 | 80.963 |
44 | KIDATU-IFAKARA | 66.90 | 04/11/2016 | 104.8 |
45 | KASULU - MANYOVU SECTION INCLUDING KASULU TOWN LINK | 68.25 | 20/02/2021 | 76.18 |
46 | KANYANI JUNCTION - MVUGWE SECTION | 70.50 | 20/02/2021 | 83.741 |
47 | KASINDE-MPANDA LOT3 | 108.00 | 12/11/2017 | 133.8 |
48 | KOMANGA KASINDE LOT2 | 112.80 | 12/11/2017 | 140 |
49 | USESULE-KOMANGA LOT1 | 117.67 | 12/11/2017 | 158.8 |