On-going
# | Name | Length (km) | Signing Date | Contract Sum (Bil) |
---|---|---|---|---|
41 | ONE STOP INSPECTION STATION (OSIS) - NYAKANAZI | - | 20/12/2016 | 25.028 |
42 | MWANZA AIRPORT | - | 06/11/2012 | 87.29 |
43 | GEITA AIRPORT | - | 09/09/2016 | 39.15 |
44 | SHINYANGA AIRPORT | - | 30/06/2017 | 55.9 |
45 | SUMBAWANGA AIRPORT | - | 30/06/2017 | 57.29 |
46 | TABORA AIPORT PHASE III | - | 30/06/2017 | 27.3 |
47 | MTWARA AIRPORT | - | 11/09/2017 | 50.36 |
48 | SONGEA AIRPORT | - | 17/09/2018 | 37.09 |
49 | BRT Phase 2 Lot 2 | - | 22/02/2017 | 44.8 |