161 | WIDENING OF MOROGORO ROAD (KIMARA –KIBAHA) | 19.20 | 13/07/2018 | 140.45 | On-going |
162 | SONGEA AIRPORT | - | 17/09/2018 | 37.09 | On-going |
163 | BRT Phase 2 Lot 1 | 20.30 | 10/12/2018 | 189.4 | On-going |
164 | ONE STOP INSPECTION STATION (OSIS) - VIGWAZA | - | 18/04/2019 | 17.138 | On-going |
165 | LOT1; PANGANI-TANGA SECTION | 50.00 | 19/07/2019 | 66.853 | On-going |
166 | J.P. MAGUFULI BRIDGE | 3.20 | 29/07/2019 | 592609 | On-going |
167 | RUDEWA - KILOSA | 24.00 | 26/09/2019 | 32.93 | On-going |
168 | IMPROVEMENT OF ASSORTED ACCIDENT BLACKSPOT - COAST | - | 01/10/2019 | 7.84 | On-going |
169 | IMPROVEMENT OF ASSORTED ACCIDENT BLACKSPOT - MOROGORO | - | 07/10/2019 | 18.77 | On-going |
170 | ONE STOP BORDER POST - KASUMULU/SONGWE | - | 06/12/2019 | 26.42 | On-going |
171 | KIBONDO - TOWN - LINK | 25.00 | 18/12/2019 | 37.64 | On-going |
172 | KAZILAMBWA - CHAGU | 36.00 | 27/12/2019 | 32 | On-going |
173 | LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION | 60.00 | 14/02/2020 | 120.86 | On-going |
174 | KIMOKOUWA WEIGHBRIDGE | - | 14/02/2020 | 14.04 | On-going |
175 | NYAMUSWA - BULAMBA | 56.40 | 01/04/2020 | 46.5 | On-going |
176 | SANZATE - NATTA | 40.00 | 02/04/2020 | 39.469 | On-going |
177 | UPGRADING OF NACHINGWEA-RUANGWA-NANGANGA ROAD (106KM) ; LOT2; RUANGWA-NANGANGA SECTION (53.2KM) | 53.20 | 27/06/2020 | 50.341 | On-going |
178 | LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION | 52.30 | 10/07/2020 | 100.84 | On-going |
179 | KASULU - MANYOVU SECTION INCLUDING KASULU TOWN LINK | 68.25 | 20/02/2021 | 76.18 | On-going |
180 | KANYANI JUNCTION - MVUGWE SECTION | 70.50 | 20/02/2021 | 83.741 | On-going |