Projects

All

#NameLength (km)Signing DateContract Sum (Bil)Stage
1KASULU - MANYOVU SECTION INCLUDING KASULU TOWN LINK 68.2520/02/202176.18On-going
2KANYANI JUNCTION - MVUGWE SECTION70.5020/02/202183.741On-going
3MVUGWE - NDUTA JUNCTION SECTION59.3520/02/202184.756On-going
4NDUTA JUNCTION - KABINGO SECTION62.5020/02/202180.963On-going
5LOT 1: NALA – VEYULA – MTUMBA – IHUMWA DRY PORT SECTION52.3010/07/2020100.84On-going
6UPGRADING OF NACHINGWEA-RUANGWA-NANGANGA ROAD (106KM) ; LOT2; RUANGWA-NANGANGA SECTION (53.2KM)53.2027/06/202050.341On-going
7SANZATE - NATTA40.0002/04/202039.469On-going
8NYAMUSWA - BULAMBA 56.4001/04/202046.5On-going
9LOT 2: IHUMWA DRY PORT – MATUMBULU – NALA SECTION60.0014/02/2020120.86On-going
10KIMOKOUWA WEIGHBRIDGE-14/02/202014.04On-going
11KAZILAMBWA - CHAGU36.0027/12/201932On-going
12KIBONDO - TOWN - LINK25.0018/12/201937.64On-going
13ONE STOP BORDER POST - KASUMULU/SONGWE-06/12/201926.42On-going
14IMPROVEMENT OF ASSORTED ACCIDENT BLACKSPOT - MOROGORO-07/10/201918.77On-going
15IMPROVEMENT OF ASSORTED ACCIDENT BLACKSPOT - COAST-01/10/20197.84On-going
16RUDEWA - KILOSA24.0026/09/201932.93On-going
17J.P. MAGUFULI BRIDGE3.2029/07/2019592609On-going
18LOT1; PANGANI-TANGA SECTION50.0019/07/201966.853On-going
19ONE STOP INSPECTION STATION (OSIS) - VIGWAZA-18/04/201917.138On-going
20BRT Phase 2 Lot 120.3010/12/2018189.4On-going